House report (with a twist)
Aug. 16th, 2005 01:16 pmToday's email reads:
First off, Helen is dead, David is now the new Helen. Well just for today.
Which is Stardate 211.87.9 according to Dan.
Things are procceding as follows;
- Both bathroom floors are being prepped for Cement boarding
-The sound insulation is in the Lv 2 front Room on the Sewer stack
-Electrical is procceding on the 3rd Lv.
-We will begin Drywalling soon. Likely this afternoon or first thing
tomorrow. So far just the non-complex stuff ( no resilent channel or sound
stuff)
-There are 2 new reactor cores coming online later in the week and will add
a combined base load production of 23,000 mega watts to the grid.
That's it for the update, Helen will return from the dead tomorrow, lLook
for the theatrical release of her harrowing adventure in your local cinema
or video rental outlet this fall.