Today, from my aunt:

Today for lunch, John, Dan and I had Juvenal beef sandwiches.

Below is an update from Dennis, For inclusion in the daily update:

The copper plumbing is now finished on the second and third floors, although the connections to Robin’s bath have just been capped awaiting the bath being moved into position.

The 99th change in Jen’s bathroom plumbing will be done when Brian the Tile drills the appropriate holes through the tiles. Hopefully I can escape to England before any more changes are contemplated.

Dennis

As of today, John reports--he wrote this-- that Dan bored a hole in floor inside wall between Robin's kitchen and bathroom for combined vent from Jen's bathroom (and Robin's tub). Cut a pipe and discovered that John [Dan did not say this directly] had bought the wrong size.

John, on Brian's instructions, broke out two tiles from Jen's bathroom wall (for sink drain and water supply). Now we have to eparie the wall behind the tiles . . . .Cheers, John
I find this deeply confusing, but assume that it is a positive sign and related to the phone questions I got yesterday regarding my plumbing. There was no update yesterday.

Saturday we did vapour barrier. We're getting quite good at it, although the black goop managed to get on my jacket (how? how? jacket wasn't even on the same floor!).

Friday report:

Today for lunch, Dan, David, John and I had ouzo shrimp and courgette, with peppers.

Brian the Tile has been there--sometime--and the floor on Jen's bathroom floor is almost done. Also the toilet flange--don't ask me.

The guys are working on the plastic plumbing, starting from the bottom up. John is working in Jen's kitchen, the hooligans are working on Jen's bathroom, going up towards the second floor sink and then to the third floor. Dan says, "What doesn't kill you, teaches you how to plastic plumb."

There is a need to tape the greenboard in Robin's bathroom.

Cheers all, Helen.
We are going to go ahead with the Housewarming Trilogy, Part 1 this Saturday. Limited guest list because I'm not really sure how many people we can inflict our far-from-finished house on. But with any luck there will be a bathroom.

And I still have to call Sears and cancel postpone the appliance delivery for the third time.
This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

Profile

electricland: (Default)
electricland

December 2012

S M T W T F S
      1
2345678
9 101112131415
16171819202122
23242526272829
3031     

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Feb. 3rd, 2026 03:36 am
Powered by Dreamwidth Studios